For the transport with a lifting device
Functionality
The tines of the lifting equipment are driven in beneath the placement platform. As soon as the tines have reached the end of the platform, a lockingpin closes beneath the platform - the platform is thereby firmly secured.The drums to be transported can now be rolled on via fold-out loading ramps. Predefined centring mechanisms ensure stable mooring of the drums, which corresponds with the load centre of the lifting equipment. Once the drums have been rolled on, the width-adjustable loading ramps are folded in and transportation can begin.
Time-saving and safe transport of cable drums
Easy storage and removal of cable drums in and out of a cable drum storage
Suitable for almost all lifting devices